A. Jhelum
B. Chanab
C. Kabul
D. Indus
Submitted by: Malik Asghar Hussain
Advertisement
Related Mcqs:
- Karot Hydropower project under construction on river?
- A. Jhelum River B. Indus River C. Chenab River D. None of these Submitted by: Ahmed Khan jamali...
- Pakistan and China held __________ Joint Coordination Committee (JCC) of the China-Pakistan Economic Corridor (CPEC) virtually on 24th May 2024?
- A. 13th B. 14th C. 15th D. None of These Submitted by: Baloch RG...
- Mohmand Hydro Power Project is being constructed on which River of Pakistan?
- A. Indus River B. Swat River C. Kabul River D. Ravi River Submitted by: Hafeez Alam Saila...
- China-Pakistan Economic Corridor (CPEC) starts at__________?
- A. Beijing B. Shanghai C. Kashgar ✓ D. Xinjiang Submitted by: Fida Ur Rasool...
- Dasu Hydropower project is being constructed on upstream of which river ?
- A. Indus B. Jhelum C. Khurram D. Kabul Submitted by: Mansoor Ahmed Suhag...
- China Pakistan Economics Corridor (CPEC) total length ?
- A. 2896 KM B. 7200 KM C. 2442 KM C. 4400 KM...
- 91 per cent of the revenues to be generated from the Gwadar port as part of the China-Pakistan Economic Corridor (CPEC) would go to__________?
- A. China B. Pakistan C. Gwadar Port Authority D. none of these...
- Dasu Hydropower project is being constructed in which district of Khyber Pakhtunkhwa ?
- A. Swabi B. Malakand C. Lakki Marwat D. Kohistan Submitted by: Mansoor Ahmed Suhag...
- The Chapari Darkhel Dam, a 10.5 MW Hydropower Project is being constructed in which district of KPK ?
- A. Kuram B. Mardan C. Gilgit D. Hunza Submitted by: Mansoor Ahmed Suhag...
- Pakistan has signed an agreement with China for _______MW Azad Pattan hydropower Project in July 2020?
- A. 800 B. 300 C. 100 D. 700 Submitted by: Asad Ullah Afridi...
Advertisement