A. Jhelum
B. Chanab
C. Kabul
D. Indus
Submitted by: Malik Asghar Hussain
Related Mcqs:
- Karot Hydropower project under construction on river?
A. Jhelum River
B. Indus River
C. Chenab River
D. None of theseSubmitted by: Ahmed Khan jamali
- Pakistan and China held __________ Joint Coordination Committee (JCC) of the China-Pakistan Economic Corridor (CPEC) virtually on 24th May 2024?
A. 13th
B. 14th
C. 15th
D. None of TheseSubmitted by: Baloch RG
- Mohmand Hydro Power Project is being constructed on which River of Pakistan?
A. Indus River
B. Swat River
C. Kabul River
D. Ravi RiverSubmitted by: Hafeez Alam Saila
- China-Pakistan Economic Corridor (CPEC) starts at__________?
A. Beijing
B. Shanghai
C. Kashgar ✓
D. XinjiangSubmitted by: Fida Ur Rasool
- Dasu Hydropower project is being constructed on upstream of which river ?
A. Indus
B. Jhelum
C. Khurram
D. KabulSubmitted by: Mansoor Ahmed Suhag
- China Pakistan Economics Corridor (CPEC) total length ?
A. 2896 KM
B. 7200 KM
C. 2442 KM
C. 4400 KM - 91 per cent of the revenues to be generated from the Gwadar port as part of the China-Pakistan Economic Corridor (CPEC) would go to__________?
A. China
B. Pakistan
C. Gwadar Port Authority
D. none of these - Dasu Hydropower project is being constructed in which district of Khyber Pakhtunkhwa ?
A. Swabi
B. Malakand
C. Lakki Marwat
D. KohistanSubmitted by: Mansoor Ahmed Suhag
- The Chapari Darkhel Dam, a 10.5 MW Hydropower Project is being constructed in which district of KPK ?
A. Kuram
B. Mardan
C. Gilgit
D. HunzaSubmitted by: Mansoor Ahmed Suhag
- Pakistan has signed an agreement with China for _______MW Azad Pattan hydropower Project in July 2020?
A. 800
B. 300
C. 100
D. 700Submitted by: Asad Ullah Afridi