A. 4073 MW
B. 4320 MW
C. 4435 MW
D. 4620 MW
Submitted by: Malik Asghar Hussain
Advertisement
Related Mcqs:
- KOTO Hydropower Project Timergara Dir of KPK Province generation capacity is _________ Megawatts?
- A. 25 MW B. 35 MW C. 40.08 MW D. None of these Submitted by: Abdurrahman...
- The Nimoo Bazgo Power Project is a run-of-the-river power project on the _______________River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian occupied Jammu and Kashmir.
- A. Neelum B. Jhelum C. Chenab D. Indus Submitted by: Mansoor Ul Haque...
- Sukhi kinari hydropower project is being built along which river?
- A. Kunhar River B. Kabul River C. Hangul River D. Indus River Submitted by: Farhan Sikandar Gondal...
- The capacity of Neelum–Jhelum Hydropower Plant is___________?
- A. 960 MW B. 950 MW C. 990 MW D. 969 MW Submitted by: Junaid...
- What is the installed generation capacity Mangla Dam?
- A. 1150 MW B. 1100 MW C. 1000 MW D. 1300 MW Submitted by: Shuaib Uddin...
- The power generation capacity of the Diamer Bhasha project will be_________?
- A. 3500MW B. 2500MW C. 3000MW D. 4500MW Submitted by: Ehtisham...
- Dasu dam is in?
- A. Sindh B. Punjab C. Baluchistan D. K.P.K Submitted by: Allass Karmani...
- The Proposed Margalla hills tunnel project connect Islamabad with which city?
- A. Sawabi B. Abbotabad C. Haripur D. Dhodail...
- The Punjab Government directed adminsitraion to remove plaques bearing names of Ministers, MNA’s, MPA’s and local leaders on development schemes installed since _________?
- A. 01 Jan 2018 B. 28 Feb 2018 C. 01 March 2018 D. 01 March 2017 Submitted by: Mansoor Ul Haque...
- SUPARCO monitors Space Weather using instruments installed all over the country with central processing facility at:__________?
- A. Islamabad B. Lahore C. Karachi D. Peshawar Submitted by: Ayaz Ali Bhanbhro...
Advertisement