A. 4073 MW
B. 4320 MW
C. 4435 MW
D. 4620 MW
Submitted by: Malik Asghar Hussain
Related Mcqs:
- KOTO Hydropower Project Timergara Dir of KPK Province generation capacity is _________ Megawatts?
A. 25 MW
B. 35 MW
C. 40.08 MW
D. None of theseSubmitted by: Abdurrahman
- The Nimoo Bazgo Power Project is a run-of-the-river power project on the _______________River situated at Alchi village, 75 kilometres (47 mi) from Leh in the Indian occupied Jammu and Kashmir.
A. Neelum
B. Jhelum
C. Chenab
D. IndusSubmitted by: Mansoor Ul Haque
- Sukhi kinari hydropower project is being built along which river?
A. Kunhar River
B. Kabul River
C. Hangul River
D. Indus RiverSubmitted by: Farhan Sikandar Gondal
- The capacity of Neelum–Jhelum Hydropower Plant is___________?
A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MWSubmitted by: Junaid
- What is the installed generation capacity Mangla Dam?
A. 1150 MW
B. 1100 MW
C. 1000 MW
D. 1300 MWSubmitted by: Shuaib Uddin
- The power generation capacity of the Diamer Bhasha project will be_________?
A. 3500MW
B. 2500MW
C. 3000MW
D. 4500MWSubmitted by: Ehtisham
- Dasu dam is in?
A. Sindh
B. Punjab
C. Baluchistan
D. K.P.KSubmitted by: Allass Karmani
- The Proposed Margalla hills tunnel project connect Islamabad with which city?
A. Sawabi
B. Abbotabad
C. Haripur
D. Dhodail - The Punjab Government directed adminsitraion to remove plaques bearing names of Ministers, MNA’s, MPA’s and local leaders on development schemes installed since _________?
A. 01 Jan 2018
B. 28 Feb 2018
C. 01 March 2018
D. 01 March 2017Submitted by: Mansoor Ul Haque
- SUPARCO monitors Space Weather using instruments installed all over the country with central processing facility at:__________?
A. Islamabad
B. Lahore
C. Karachi
D. PeshawarSubmitted by: Ayaz Ali Bhanbhro