A. 969 Mwt
B. 4500 Mwt
C. 425 Mgw
D. 3200 Mwt
Related Mcqs:
- The Installed Capacity of Neelum–Jhelum Hydropower Plant is __________ MW?
A. 948
B. 955
C. 962
D. 969 - The capacity of Neelum–Jhelum Hydropower Plant is___________?
A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MWSubmitted by: Junaid
- What is total installed capacity to produce power of proposed Dasu Hydropower Project?
A. 4073 MW
B. 4320 MW
C. 4435 MW
D. 4620 MWSubmitted by: Malik Asghar Hussain
- Recently inaugurated Chashma- III nuclear power plant can generate___________ megawatts of electricity?
A. 340 megawatts
B. 360 megawatts
C. 400 megawatts
D. 150 megawatts - River Neelum is situated in _________?
A. AJ&K
B. KPK
C. FATA
D. Panjab - International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.
A. 5
B. 7
C. 9
D. 11 - The area between rivers Jhelum and Chenab is called?
A. Gandhara
B. Chaj
C. Taxila
D. Harrapa - In which of the following city Military College Jhelum is located?
A. Risalpur
B. Islamabad
C. Sarai Alam Gir
D. Sargodha - Who was the ruler of the kingdom between the rivers Jhelum and Chenab?
A. King Porus
B. Darius III
C. Darius ll
D. Alexander the GreatSubmitted by: Rashid Mehmood
- Which Doab is Between Indus River and Jhelum River?
A. Chaj Doab
B. Rachna Doab
C. Bari Doab
D. Sindh Sagar DoabSubmitted by: Ubaid Noonari
The correct answer to the question: "Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?" is "969 Mwt ".