A. 5
B. 7
C. 9
D. 11
Related Mcqs:
- River Neelum is situated in _________?
A. AJ&K
B. KPK
C. FATA
D. Panjab - The Installed Capacity of Neelum–Jhelum Hydropower Plant is __________ MW?
A. 948
B. 955
C. 962
D. 969 - The capacity of Neelum–Jhelum Hydropower Plant is___________?
A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MWSubmitted by: Junaid
- The Land lying between the River Indus and River Jhelum is called:
A. Bari Doab
B. Chaj Doab
C. Rachna Doab
D. Sindh sagar DoabSubmitted by: Farjan Ahmed Soomro
- The land lying between the river Ravi and river Chenab is called________?
A. Bari Doab
B. Chaj Doab
C. Rachna Doab
D. Sindh sagar DoabSubmitted by: Farjan Ahmed Soomro
- Which River is joining in the river Indus at Attock ?
A. Kabul River
B. Kunar River
C. Hakra River
D. None of TheseSubmitted by: Zohaib Saleem
- After Indus river the longest river in Pakistan is__________?
A. Ravi River
B. Satlej river
C. Dasht river
D. None of theseSubmitted by: Chris Danial
- Which Doab is Between Indus River and Jhelum River?
A. Chaj Doab
B. Rachna Doab
C. Bari Doab
D. Sindh Sagar DoabSubmitted by: Ubaid Noonari
- No Person Shall be appointed as the Judge of Supreme Court of Pakistan unless he/ she has been Judge of High Court for a Period of __________?
A. 15 years
B. 5 Years
C. 25 years
D. None of theseSubmitted by: Sajjad Hussain Rattar
- Who was the president of International Court of Justice (ICJ) from Pakistan?
A. Z.A bhutto
B. Sir Muhammad Zafrulla Khan
C. Liaqut Ali khan
D. No oneSubmitted by: Jinjh Ghulam qadir
The correct answer to the question: "International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River." is "9".