A. 948
B. 955
C. 962
D. 969
Related Mcqs:
- The capacity of Neelum–Jhelum Hydropower Plant is___________?
A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MWSubmitted by: Junaid
- What is total installed capacity to produce power of proposed Dasu Hydropower Project?
A. 4073 MW
B. 4320 MW
C. 4435 MW
D. 4620 MWSubmitted by: Malik Asghar Hussain
- KOTO Hydropower Project Timergara Dir of KPK Province generation capacity is _________ Megawatts?
A. 25 MW
B. 35 MW
C. 40.08 MW
D. None of theseSubmitted by: Abdurrahman
- What is the installed generation capacity Mangla Dam?
A. 1150 MW
B. 1100 MW
C. 1000 MW
D. 1300 MWSubmitted by: Shuaib Uddin
- International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.
A. 5
B. 7
C. 9
D. 11 - River Neelum is situated in _________?
A. AJ&K
B. KPK
C. FATA
D. Panjab - In which of the following city Military College Jhelum is located?
A. Risalpur
B. Islamabad
C. Sarai Alam Gir
D. Sargodha - The Land lying between the River Indus and River Jhelum is called:
A. Bari Doab
B. Chaj Doab
C. Rachna Doab
D. Sindh sagar DoabSubmitted by: Farjan Ahmed Soomro
- Where do Jhelum & Chenab river meets ?
A. Khanki Headworks
B. Trimmu
C. Panjnad
D. Rasool PurSubmitted by: Mansoor Ahmed Suhag
- Who was the ruler of the kingdom between the rivers Jhelum and Chenab?
A. King Porus
B. Darius III
C. Darius ll
D. Alexander the GreatSubmitted by: Rashid Mehmood
The correct answer to the question: "The Installed Capacity of Neelum–Jhelum Hydropower Plant is __________ MW?" is "969".