A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MW
Submitted by: Junaid
Advertisement
Related Mcqs:
- The Installed Capacity of Neelum–Jhelum Hydropower Plant is __________ MW?
- A. 948 B. 955 C. 962 D. 969...
- Neelum-Jhelum Hydropower Plant based in Muzzafarabad will produce electricity?
- A. 969 Mwt B. 4500 Mwt C. 425 Mgw D. 3200 Mwt...
- What is total installed capacity to produce power of proposed Dasu Hydropower Project?
- A. 4073 MW B. 4320 MW C. 4435 MW D. 4620 MW Submitted by: Malik Asghar Hussain...
- KOTO Hydropower Project Timergara Dir of KPK Province generation capacity is _________ Megawatts?
- A. 25 MW B. 35 MW C. 40.08 MW D. None of these Submitted by: Abdurrahman...
- River Neelum is situated in _________?
- A. AJ&K B. KPK C. FATA D. Panjab...
- International Court of Arbitration sets minimum flow of __________ m3/sec into the Neelum River.
- A. 5 B. 7 C. 9 D. 11...
- The area between rivers Jhelum and Chenab is called?
- A. Gandhara B. Chaj C. Taxila D. Harrapa...
- The Land lying between the River Indus and River Jhelum is called:
- A. Bari Doab B. Chaj Doab C. Rachna Doab D. Sindh sagar Doab Submitted by: Farjan Ahmed Soomro...
- Where do Jhelum & Chenab river meets ?
- A. Khanki Headworks B. Trimmu C. Panjnad D. Rasool Pur Submitted by: Mansoor Ahmed Suhag...
- Who was the ruler of the kingdom between the rivers Jhelum and Chenab?
- A. King Porus B. Darius III C. Darius ll D. Alexander the Great Submitted by: Rashid Mehmood...
Advertisement