A. 960 MW
B. 950 MW
C. 990 MW
D. 969 MW
Submitted by: Junaid
Related Mcqs:
- What is total installed capacity to produce power of proposed Dasu Hydropower Project?
A. 4073 MW
B. 4320 MW
C. 4435 MW
D. 4620 MWSubmitted by: Malik Asghar Hussain
- KOTO Hydropower Project Timergara Dir of KPK Province generation capacity is _________ Megawatts?
A. 25 MW
B. 35 MW
C. 40.08 MW
D. None of theseSubmitted by: Abdurrahman
- River Neelum is situated in _________?
A. AJ&K
B. KPK
C. FATA
D. Panjab - The area between rivers Jhelum and Chenab is called?
A. Gandhara
B. Chaj
C. Taxila
D. Harrapa - In which of the following city Military College Jhelum is located?
A. Risalpur
B. Islamabad
C. Sarai Alam Gir
D. Sargodha - The Land lying between the River Indus and River Jhelum is called:
A. Bari Doab
B. Chaj Doab
C. Rachna Doab
D. Sindh sagar DoabSubmitted by: Farjan Ahmed Soomro
- Where do Jhelum & Chenab river meets ?
A. Khanki Headworks
B. Trimmu
C. Panjnad
D. Rasool PurSubmitted by: Mansoor Ahmed Suhag
- Who was the ruler of the kingdom between the rivers Jhelum and Chenab?
A. King Porus
B. Darius III
C. Darius ll
D. Alexander the GreatSubmitted by: Rashid Mehmood
- Which Doab is Between Indus River and Jhelum River?
A. Chaj Doab
B. Rachna Doab
C. Bari Doab
D. Sindh Sagar DoabSubmitted by: Ubaid Noonari
- Sukhi kinari hydropower project is being built along which river?
A. Kunhar River
B. Kabul River
C. Hangul River
D. Indus RiverSubmitted by: Farhan Sikandar Gondal