A. a planning layout
B. flow of material
C. advancing a programme in automatic machines
D. copying complicated profiles
E. none of the above
Related Mcqs:
- Gnatt charts are used for_________________?
A. forecasting sales
B. production schedule
C. scheduling and routing
D. linear programming
E. none of the above - Process layout is employed for_________________?
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above
E. none of the above - Material handling in automobile industry is done by_________________?
A. overhead crane
B. trolley
C. belt conveyor
D. all of the above
E. none of the above - Product layout is employed for____________________?
A. batch production
B. continuous production
C. effective utilization of machine
D. all of the above
E. none of the above - Standard time as compared to normal time is_______________?
A. greater
B. smaller
C. equal
D. there is no such correlation
E. none of the above - PERT has following time estimate_________________?
A. one time estimate
B. two time estimate
C. three time estimate
D. four time estimate
E. nil time estimate - The technique of value analysis can be applied to____________________?
A. complicated items only
B. simple items only
C. crash programmer items only
D. cost consciousness items only
E. any item - If a worker gets a daily wage of Rs HA, then according to Rowan plan, his maximum daily earnings can be______________________?
A. 2 HA
B. 1.33 HA
C. 1.5 HA
D. 1.15 HA
E. 2.5 HA - PERT/CPM, techniques can be used for following applications____________________?
A. once through project
B. maintenance jobs
C. research and development
D. all non-technical jobs
E. all of the above - The reasons which are basically responsible for the formation of a queue should be that ___________________?
A. the average service rate Hess than the average arrival rate
B. output rate is linearly proportional to input
C. output rate is constant and the input varies in a random manner
D. all of the above
E. none of the above