A. latest allowable time and the normal expected time
B. latest allowable time and the earliest expected time
C. proposed allowable time and the earliest expected time
D. normal allowable time and the latest expected time
E. project initiation tune and actual starting time
Related Mcqs:
- If TL is the largest allowable event occurrence time, total activity slack (s) is equal to__________________?
A. latest start time – earliest start time
B. latest finish time – earliest finish time (EFT)
C. TL-EFT
D. all of the above
E. none of the above - Slack of various events on the critical path in PERT/CPM chart___________________?
A. increases continuously
B. decreases continuously
C. remains constant
D. may increase or decrease depending on various factors
E. unpredictable - Positive slack on a PERT indicates that project is________________?
A. ahead of schedule
B. beyond schedule
C. as per schedule
D. on critical path
E. none of the above - CPM is the___________________?
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique - The basic difference between PERT and CPM is that_____________?
A. PERT deals with events and CPM with activities
B. critical path is determined in PERT only
C. costs are considered on CPM only and not in PERT
D. guessed times are used in PERT and evaluated times in CPM
E. PERT is used in workshops and CPM in plants - The difference between the time available to do the job and the time required to do the job, is known as_________________?
A. event
B. float
C. duration
D. constraint
E. none of the above - Which one of the following represents a group incentive plan ?
A. Scanlon Plan
B. Rowan Plan
C. Bedaux Plan
D. Taylor Differential Piece Rate System
E. Halsey Premium Plan - Which one of the following represents a group incentive plan ?
A. Halsey Premium Plan
B. Bedaux Plan
C. Lincoln Plan
D. Rowan Plan
E. Taylor Plan - Pick up the correct statement about relationship between various floats______________________?
A. free float = total float
B. independent float = total float
C. independent float > free float
D. free float > total float
E. independent float < free float - Motion study is used for________________?
Choose the wrong statement?
A. improving a work method
B. improvising a work method
C. designing a work method
D. providing a schematic framework
E. reducing inventory costs