A. completion of 22km tunnel to divert water from Kishanganga to Wullar lake will leave Pakistan falling a 27% Water deficit.
B. It would reduce flow of Neelum River and thus decrease the power generation of Pakistan’s proposed 696-mw Neelum-Jehlum hydropower project in Azad Kashmir.
C. both of these
D. none of these