A. Barometer
B. Hygrometer
C. U-tube manometer
D. Venturi metre
Related Mcqs:
- Due to which of the following reasons the cables should not be operated too hot ?
A. The oil may loose its viscosity and it may start drawing off from higher levels
B. Expansion of the oil may cause the sheath to burst
C. Unequal expansion may create voids in the insulation which will lead to ionization
D. The thermal instability may rise due to the rapid increase of dielectric losses with temperature
E. All of the above - Steam turbines are governed by the following methods_____________?
A. Throttle governing
B. Nozzle control governing
C. By-pass governing
D. all of the above - Which of the following load is responsible for lower power factor of supply system__________?
A. induction motors
B. resistive loads
C. synchronous Motors
D. all of the above - Which of the following power plant has highest Depreciation charges?
A. Thermal plant
B. Diesel plant
C. Hydroelectric plant
D. All have same - Which of the following power plant has least fuel transportation______________?
A. nuclear power plants
B. diesel generating plants
C. thermal power plants
D. steam power stations - Which of the following generating station has minimum running cost?
A. Nuclear
B. Hydro
C. Thermal
D. Diesel - Which of the following is usually not the generating voltage__________?
A. 6.6 kV
B. 9.9 kV
C. 11kV
D. 13.2kV - Which of the following Power Plant causes least environmental pollution____________?
A. Thermal Power Plant
B. Hydro Power Plant
C. Nuclear Power Plant
D. Diesel Power Plant - Which of the following power plant usually offer highest maintenance cost___________?
A. Nuclear power plants
B. Hydro-electric power plants
C. Thermal power plants
D. Diesel engine power plant - Which of the following power plant has least efficiency_________?
A. Nuclear power plant
B. Hydro power plant
C. Steam power plant
D. Diesel power plant