A. Nuclear
B. Hydro
C. Thermal
D. Diesel
Advertisement
Related Mcqs:
- For a diesel generating station the useful life is expected to be around_________Years?
- A. 15 to 20 years B. 20 to 50 years C. 50 to 75 years D. 75 to 100 years...
- Different generating stations use following prime movers?
- A. diesel engine B. hydraulic turbine C. gas turbine D. steam turbine E. any of the above...
- ____________is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order.
- A. Hot reserve B. Cold reserve C. Spinning reserve D. Firm power...
- Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
- A. firm power B. cold reserve C. hot reserve D. spinning reserve...
- For a power plant which of the following constitutes running cost?
- A. Cost of wages B. Cost of fuel C. Cost of lubricants D. All of the above...
- With reference to a power station which of the following is not a fixed cost?
- A. Fuel cost B. Interest on capital C. Insurance charges D. Depreciation...
- For which of the following power plants highly skilled engineers are required for running the plants?
- A. Solar power plants B. Gas turbine power plants C. Nuclear power plants D. Hydro-electric power plants...
- Load factor of a power station is generally___________?
- A. equal to unity B. less than unity C. more than unity D. equal to zero Diversity factor is always...
- The expected useful life of an hydroelectric power station is around_________________?
- A. 15 years B. 30 years C. 60 years D. 100 years...
- For high value of diversity factor, a power station of given installed capacity will be in a position to supply?
- A. less number of consumers B. more number of consumers C. neither A. nor B. D. either A. or B....
Advertisement