A. peak load plants
B. base load plants
C. either A. or (b)
D. none of the above
Related Mcqs:
- For which of the following power plants highly skilled engineers are required for running the plants?
A. Solar power plants
B. Gas turbine power plants
C. Nuclear power plants
D. Hydro-electric power plants - Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
A. firm power
B. cold reserve
C. hot reserve
D. spinning reserve - Generators for peak load plants are usually designed for maximum efficiency at____________?
A. 25 to 50 percent full load
B. 50 to 75 percent full load
C. full load
D. 25 percent overload - In power plants insurance cover is provided for which of the following?
A. Unskilled workers only
B. Skilled workers only
C. Equipment only
D. All of the above - In which’of the following power plants the maintenance cost is usually high?
A. Nuclear power plant
B. Hydro-electric power plants
C. Thermal power plants
D. Diesel engine power plants - Which of the following power plants need the least period for installation ?
A. Thermal power plant
B. Diesel power plant
C. Nuclear power plant
D. Hydro-electric power plant - Which of the following plants is almost inevitably used as base load plant?
A. Diesel engine plant
B. Gas turbine plant
C. Nuclear power plant
D. Pumped storage plant - In two part tariff, variation in load factor will affect____________?
A. fixed charges
B. operating or running charges
C. both A. and (b)
D. either A. or (b) - In a power plant if the maximum demand on the plant is equal to the plant capacity, then
A. plant reserve capacity will be zero
B. diversity factor will be unity
C. load factor will be unity
D. load factor will be nearly 60% - An over excited synchronous motor on no load is known as__________?
A. synchronous condenser
B. generator
C. induction motor
D. alternator