A. Hot reserve
B. Cold reserve
C. Spinning reserve
D. Firm power
Related Mcqs:
- Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
A. firm power
B. cold reserve
C. hot reserve
D. spinning reserve - Which of the following generating station has minimum running cost ?
A. Nuclear
B. Hydro
C. Thermal
D. Diesel - Different generating stations use following prime movers?
A. diesel engine
B. hydraulic turbine
C. gas turbine
D. steam turbine
E. any of the above - For a diesel generating station the useful life is expected to be around_________Years?
A. 15 to 20 years
B. 20 to 50 years
C. 50 to 75 years
D. 75 to 100 years - Air will not be the working substance in which of the following?
A. Open cycle gas turbine
B. Closed cycle gas turbine
C. Diesel engine
D. Petrol engine - Annual depreciation of the plant it proportional to the earning capacity of the plant vide
A. sinking fund depreciation
B. straight line depreciation
C. reducing balances depreciation
D. none of the above - In a power plant if the maximum demand on the plant is equal to the plant capacity, then
A. plant reserve capacity will be zero
B. diversity factor will be unity
C. load factor will be unity
D. load factor will be nearly 60% - Large capacity generators are invariably___________?
A. water cooled
B. natural air cooled
C. forced air cooled
D. hydrogen cooled - For high value of diversity factor, a power station of given installed capacity will be in a position to supply?
A. less number of consumers
B. more number of consumers
C. neither A. nor B.
D. either A. or B. - Power plant having maximum demand more than the installed rated capacity will have utilization factor?
A. equal to unity
B. less than unity
C. more than unity
D. none of the above