A. WL /P
B. WL/2P
C. WL/3P
D. WL/4P
Related Mcqs:
- A pre-stressed rectangular beam which carries two concentrated loads W at L/3 from either end, is provided with a bent tendon with tension P such that central one-third portion of the tendon remains parallel to the longitudinal axis, the maximum dip h is_____________________?
A. WL/P
B. WL/2P
C. WL/3P
D. WL/4P - In a pre-stressed beam carrying an external load W with a bent tendon is having angle of -stressed load P. The net downward load at the centre is_________________?
A. W – 2P
B. W – P
C. W – P
D. W – 2P - If a rectangular pre-stressed beam of an effective span of 5 meters and carrying a total load 3840 kg/m, is designed by the load balancing method, the central dip of the parabolic tendon should be_________________?
A. 5 cm
B. 10 cm
C. 15 cm
D. 20 cm - If K is a constant depending upon the ratio of the width of the slab to its effective span l, x is the distance of the concentrated load from the nearer support, bw is the width of the area of contact of the concentrated load measured parallel to the supported edge, the effective width of the slab be is_______________?
A. K/x (1 + x/d) + bw
B. Kx (1 – x/l) + bw
C. Kx (1 + x/l) + bw
D. All the above - If the maximum dip of a parabolic tendon carrying tension P is h and the effective length of the pre-stressed beam is L, the upward uniform pressure will be________________?
A. 8hp/ l
B. 8hp/l²
C. 8hl/p
D. 8hl/p² - If depth of slab is 10 cm, width of web 30 cm, depth of web 50 cm, centre to centre distance of beams 3 m, effective span of beams 6 m, the effective flange width of the beam, is________________?
A. 200 cm
B. 300 cm
C. 150 cm
D. 100 cm - If W is total load per unit area on a panel, D is the diameter of the column head, L is the span in two directions, then the sum of the maximum positive bending moment and average of the negative bending moment for the design of the span of a square flat slab, should not be less than________________?
A. WL/12 (L – 2D/3)²
B. WL/10 (L + 2D/3)²
C. WL/10 (L – 2D/3)²
D. WL/12 (L – D/3)² - In testing a pile by load test, pile platform is loaded with one and half times the design load and a maximum settlement is noted. The load is gradually removed and the consequent rebound is measured. For a safe pile, the net settlement (i.e. total settlement minus rebound) per tonne of test load should not exceed________________?
A. 10 mm
B. 15 mm
C. 20 mm
D. 25 mm - If the length of an intermediate span of a continuous slab is 5m, the length of the end span is kept_______________?
A. 4.5 m
B. 4.0 m
C. 3.5 m
D. 3.0 m - For a continuous floor slab supported on beams, the ratio of end span length and intermediate span length, is____________________?
A. 0.6
B. 0.7
C. 0.8
D. 0.9