A. straight line
B. parabolic
C. elliptical
D. combination of straight and parabolic
Related Mcqs:
- Tie bars in cement concrete pavements are at______________?
A. expansion joints
B. contraction joints
C. warping joints
D. longitudinal joints - For water bound macadam roads in localities of heavy rainfall, the recommended value of camber is_______________?
A. 1 in 30
B. 1 in 36
C. 1 in 48
D. 1 in 60 - Camber in the road is provided for_______________?
A. effective drainage
B. counteracting the centrifugal force
C. having proper sight distance
D. none of the above - The camber of road should be approximately equal to___________________?
A. longitudinal gradient
B. two times the longitudinal gradient
C. three times the longitudinal gradient
D. half the longitudinal gradient - The camber of shoulders in water bound macadam roads is________________?
A. equal to the cross slope of pavement
B. less than the cross slope of pavement
C. greater than the cross slope of pavement
D. zero - The camber for hill roads in case of bituminous surfacing is adopted as________________?
A. 2%
B. 2.5%
C. 3%
D. 4% - The critical combination of stresses for corner region in cement concrete roads is____________?
A. load stress + warping stress frictional stress
B. load stress + warping stress + frictional stress
C. load stress + warping stress
D. load stress + frictional stress - When the bituminous surfacing is done on already existing black top road or over existing cement concrete road, the type of treatment to be given is________________?
A. seal coat
B. tack coat
C. prime coat
D. spray of emulsion - The maximum thickness of expansion joint in rigid pavements is______________?
A. 0
B. 25 mm
C. 50 mm
D. 100 mm - Maximum daily traffic capacity of bituminous pavements is______________?
A. 500 tonnes per day
B. 1000 tonnes per day
C. 1500 tonnes per day
D. 2000 tonnes per day