A. climatic condition
B. type and intensity of traffic
C. subgrade soil and drainage conditions
D. availability of funds for the construction project
- Highway Engineering
- Highway Engineering
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.