A. regulatory sign
B. warning sign
C. informatory sign
D. none of the above
Related Mcqs:
- On a single lane road with two way traffic, the minimum stopping sight distance is equal to______________?
A. stopping distance
B. two times the stopping distance
C. half the stopping distance
D. three times the stopping distance - Stopping sight distance is always_______________?
A. less than overtaking sight distance
B. equal to overtaking sight distance
C. more than overtaking sight distance
D. none of the above - Select the correct statement_________________?
A. Psychological extra widening depends on the number of traffic lanes.
B. Mechanical extra widening depends on the speed of vehicle.
C. Psychological extra widening depends on the length of wheel base.
D. Psychological extra widening depends on the speed of vehicle - In case of summit curves, the deviation angle will be maximum when_______________?
A. an ascending gradient meets with another ascending gradient
B. an ascending gradient meets with a descending gradient
C. a descending gradient meets with another descending gradient
D. an ascending gradient meets with a level surface - Which of the following is known as design capacity ?
A. basic capacity
B. theoretical capacity
C. possible capacity
D. practical capacity - As per IRC recommendations, the average level of illumination on important roads carrying fast traffic is______________?
A. 10 lux
B. 15 lux
C. 20 lux
D. 30 lux - In CBR test the value of CBR is calculated at_______________?
A. 2.5 mm penetration only
B. 5.0 mm penetration only
C. 7.5 mm penetration only
D. both 2.5mm and 5.0 mm penetrations - Group index method of design of flexible pavement is_______________?
A. a theoretical method
B. an empirical method based on physical properties of subgrade soil
C. an empirical method based on strength characteristics of subgrade soil
D. a semi empirical method - Tie bars in cement concrete pavements are at______________?
A. expansion joints
B. contraction joints
C. warping joints
D. longitudinal joints - Select the correct statement________________?
A. Quantity of binder required for tack coat is less than that required for prime coat
B. Prime coat treatment is given for plugging the voids in water bound macadam during bituminous road construction
C. Seal coat is the final coat over certain previous bituminous pavements
D. A bitumen primer is a high viscosity cutback