A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate
Related Mcqs:
- Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 % - The main factor to be considered while preparing a detailed estimate, is________________?
A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. All the above - For the construction of buildings, the subheads of the estimate are________________?
A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above - Brick walls are measured in sq. m if the thickness of the wall is_________________?
A. 10 cm
B. 15 cm
C. 20 cm
D. None of these - The expected out turn of cement concrete 1 : 2 : 4 per mason per day is_________________?
A. 1.5 m 3
B. 2.5 m3
C. 3.5 m3
D. 5.0 m3 - According to ISI method of measurement, the order of the sequence is_________________?
A. Length, breadth, height
B. Breadth, length, height
C. Height, length, breadth
D. None of these - The total length of a cranked bar through a distance D. at 45° in case of a beam of effective length L, is_________________?
A. L + 0.42 d
B. L + (2 × 0.42 d)
C. L – (0.42 d)
D. L – (2 × 0.4 d) - The item of steel work which is measured in sq.m, is_________________?
A. Collapsible gates
B. Rolling shutters
C. Ventilators and glazing
D. All the above - The measurement is made in square metre in case of_________________?
A. Cement concrete in foundation
B. R.C.C. structure
C. Hollow concrete block wall
D. None of these - The inspection pit or chamber is a manhole provided in a base drainage system________________?
A. At every change of direction
B. At every change of gradient
C. At every 30 m intervals
D. All the above