A. Earthwork, Concrete work, Brick work
B. Brickwork, Stone work, Roofing
C. Brickwork Flooring, Wood work, Steel work
D. All the above
Related Mcqs:
- Due to change in price level, a revised estimate is prepared if the sanctioned estimate exceeds_________________?
A. 2.0 %
B. 2.5 %
C. 4.0 %
D. 5.0 % - The main factor to be considered while preparing a detailed estimate, is________________?
A. Quantity of the materials
B. Availability of materials
C. Transportation of materials
D. All the above - The most reliable estimate is_________________?
A. Detailed estimate
B. Preliminary estimate
C. Plinth area estimate
D. Cube rate estimate - While estimating the qualities for the construction of a building, the correct metric unit is________________?
A. Metre for length
B. Cubic metre for area
C. Square metres for volume
D. Litre for capacity - In the mid-section formula__________________?
A. The mean depth is the average of depths of two consecutive sections
B. The area of mid-sections is calculated by using mean depth
C. The volume of the earth work is calculated by multiplying the mid-section area by the distance between the two original sections
D. All of the above - The rate of payment is made for 100 cu m (per % cu m) in case of__________________?
A. Earth work in excavation
B. Rock cutting
C. Excavation in trenches for foundation
D. All the above - The area is measured correct to the nearest___________________?
A. 0.01 sqm
B. 0.02 sqm
C. 0.03 sqm
D. 0.04 sqm - The expected out turn of 12 mm plastering with cement mortar is_______________?
A. 2.5 sq m
B. 4.0 sq m
C. 6.0 sq m
D. 8.0 sq m - Pick up the incorrect statement regarding a master trap from the following ?
A. It is provided in between the lower end of the house drain and the street sewer
B. It is provided a cleaning eye at the top of the trap
C. The mica flap valve which opens inwards only, is fitted at the top of the inlet pipe
D. The water seal is less than that of ordinary traps - For 12 mm thick cement plastering 1 : 6 on 100 sq.m new brick work, the quantity of cement required, is___________________?
A. 0.200 m3
B. 0.247 m3
C. 0.274 m3
D. 0.295 m3