A. time of transit
B. ‘vater-cement ratio
C. the air in the mix
D. size of aggregate
- Design of Concrete Structures
- Design of Concrete Structures
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.