A. higher initial setting time but lower final setting time
B. lower initial setting time but higher final setting time
C. higher initial and final setting times
D. lower initial and final setting times
Related Mcqs:
- As compared to ordinary portland cement, use of pozzuolanic cement_______________?
A. reduces workability
B. increases bleeding
C. increases shrinkage
D. increases strength - The percentage of voids in cement is approximately_______________?
A. 25%
B. 40%
C. 60%
D. 80% - Maximum quantity of water needed per 50 kg of cement for M 15 grade of concrete is_______________?
A. 28 liters
B. 30 liters
C. 32 liters
D. 34 liters - In case of hand mixing of concrete, the extra cement to be added is__________________?
A. 5%
B. 10%
C. 15%
D. 20% - The compressive strength of 100 mm cube as compared to 150 mm cube is always_______________?
A. less
B. more
C. equal
D. none of the above - The strength of concrete after one year as compared to 28 days strength is about_______________?
A. 10 to 15% more
B. 15 to 20% more
C. 20 to 25% more
D. 25 to 50% more - The load carrying capacity of a helically reinforced column as compared to that of a tied column is about________________?
A. 5% less
B. 10% less
C. 5% more
D. 10% more - The percentage of reinforcement in case of slabs, when high strength deformed bars are used is not less than________________?
A. 0.15
B. 0.12
C. 0.30
D. 1.00 - Which of the following has high tensile strength ?
A. plain hot rolled wires
B. cold drawn wires
C. heat treated rolled wires
D. all have same tensile strength - Stress strain curve of high tensile steel_______________?
A. has a definite yield point
B. does not show definite yield point but yield point is defined by 0.1% proof stress
C. does not show definite yield point but yield point is defined by 0.2% proof stress
D. does not show definite yield point but yield point is defined by 2% proof stress