A. non homogeneous relationship
B. homogeneous relationship
C. an internal relationship
D. an extreme relationship
0
The method which considers the lowest and highest values of cost driver and cost within relevant range is called ____________?
0
If an unexplained variation is 350050 and the total variation is 700505, then coefficient of determination would be ____________?
A. low high method
B. constant equation
C. variable equation
D. high low method
0
The situation in which two or more independent variables are highly correlated is known as ___________?
A. 3
B. 0.5003
C. 0.7003
D. 2
0
In Regression Analysis, if an observed cost value is 85 and the disturbance error is 25 then predicted cost value will be ___________?
A. price linearity
B. cost linearity
C. division linearity
D. multi-collinearity
0
The examples of nonlinear cost functions are _____________?
A. 95
B. 50
C. 120
D. 100
0
In adjustment issues of costing, the database must consider wide range values of __________?
A. step constant functions
B. step cost functions
C. step price functions
D. step object functions
0
In the specification analysis, the assumptions related to linearity states but linearity must be within ____________?
A. fixed object
B. cost driver
C. cost object
D. mixed object
0
If the difference in costs is $16000 and the slope coefficient is 0.40, then difference in machine hours would be __________?
A. irrelevant range
B. relevant range
C. significant range
D. insignificant range
0
In plotting of cost functions, the level of activities according to which the charged cost is represented on ____________?
A. $50,000
B. $5,400
C. $6,400
D. $40,000
Download App