A. Silt excluders
B. Silt ejectors
C. Vortex pipes
D. Silt control structures
Related Mcqs:
- The water level required on the upstream side of a canal head regulator, so as to feed the off-taking canal with its full supply is called_________________?
A. HFL
B. FSL
C. Pond level
D. Canal level - A regulator is water controlling structure, it is provided at the head of canal to supply water from parent canal to the branch channel is called_______________________?
A. Head Regulator
B. Cross-Regulator
C. Escape
D. All are correct - The angle between a head regulator and entrance of water, for smooth entry of water in a canal is kept as _________________?
A. 90°
B. 100°
C. 110°
D. 120° - When a weir is constructed, the downstream .bed of the river goes on eroding and consequently causes progressive lowering of the bed on downstream of weir called__________________?
A. Retrogression
B. Lowering down of bed
C. Ponding on down stream
D. All are correct - An open cut in the canal bank. with bed and sides to escape canal water through a lead channel to mix water in a nearby drain is called _____________________?
A. Inlet
B. Out let
C. Module
D. Exit - When FSL of the canal is sufficiently above the bed level of drainage so that canal flows under syphonis action, the structure is called _____________________?
A. Super passage
B. Syphon – Aqueduct
C. Canal-syphon
D. Aqueduct - The under sluices in a weir are provided, at the level of upstream floor dispose off the sediment deposited on downstream is called______________________?
A. Under sluices
B. Head sluices
C. Scouring sluices
D. Sluice gates - Canals normally excavated directly from river without head regulator is called___________________?
A. Perennial canals
B. Inundation canals
C. Non-perennial canals
D. Water shed canals - The various works constructed on river side to control the flow and pass it safely from hydraulic structures are called ___________________?
A. River controlling works
B. River Training works
C. Marginal Embankment
D. Guide Banks - When the high flood level of the drain is sufficiently below the bed of the Canal that the drainage water flows freely under gravity, such structure is called___________________?
A. Aqueduct
B. Syphon-aqueduct
C. Cross-Drainage
D. Non-gravity structure