A. 90°
B. 100°
C. 110°
D. 120°
Related Mcqs:
- A regulator is water controlling structure, it is provided at the head of canal to supply water from parent canal to the branch channel is called_______________________?
A. Head Regulator
B. Cross-Regulator
C. Escape
D. All are correct - The water level required on the upstream side of a canal head regulator, so as to feed the off-taking canal with its full supply is called_________________?
A. HFL
B. FSL
C. Pond level
D. Canal level - The structures, which are constructed on the river bed upstream of head regulator. With this clear water enters in canal such structures are called______________________?
A. Silt excluders
B. Silt ejectors
C. Vortex pipes
D. Silt control structures - An open cut in the canal bank. with bed and sides to escape canal water through a lead channel to mix water in a nearby drain is called _____________________?
A. Inlet
B. Out let
C. Module
D. Exit - An open cut given in a canal bank, suitably protected by stone pitching to the upland drainage water into the canal is called ___________________?
A. Inlet
B. Out let
C. entrance
D. Mixing - In high floods, to avoid spilling of flood water over the gates, a wall is provided from pond level to high Flood level. This wall spans for the entire length of regulator, rest on piers, sustain water pressure by its weight called_____________________?
A. Retaining wall
B. Divide wall
C. Breast wall
D. Cantilever wall - Canals normally excavated directly from river without head regulator is called___________________?
A. Perennial canals
B. Inundation canals
C. Non-perennial canals
D. Water shed canals - When FSL of the canal is sufficiently above the bed level of drainage so that canal flows under syphonis action, the structure is called _____________________?
A. Super passage
B. Syphon – Aqueduct
C. Canal-syphon
D. Aqueduct - The fixing of points in such away or the ground to have a correct lines for setting a canal or water course is called _________________?
A. Lining of canal
B. Alignment of canal
C. Designing of canal
D. All are correct - Out/ of a well water is more than canal water because____________________?
A. Conveyance losses in well irrigation are less
B. Well water is clear than canal water
C. Lifting of water increase cost of well water
D. Well water is used economically