A. E2 – E1
B. E2 / E1
C. E1 – E2
D. E1 / E2
Related Mcqs:
- The depth before the jump is always less then the depth after the jump. The depth before the jump is called initial depth and depth after the jump is called_______________?
A. Afflux
B. Final depth
C. Sequent depth
D. Down stream water depth - The hydraulic jump is formed on down stream of toe of glacis for the purpose to dissipate surplus energy of the flowing water, the nature and strength of jump depends upon a Number called______________________?
A. Reynolds
B. Froude No
C. Webber
D. Darcy,s law - For strong Hydraulic jump containing maximum energy, the down stream glacis should be sloped at a slope of ______________ to dissipate max: energy?
A. 2:1 to 2.5:1
B. 2.5:1 to 3:1
C. 3:1 to 5:1
D. 5:1 to 6 - A hydraulic jump to dissipate energy when flow is __________________?
A. Critical flow
B. Shooting flow
C. Streaming flow
D. Turbulent flow - Hydraulic structures are designed for a safe flow of flood. The floods which are equal in designed magnitude life of the project is called _____________________?
A. High floods
B. Ordinary floods
C. Low floods
D. Probable flood - The total energy line lies over the hydraulic gradient line by an amount equal to________________?
A. v2/2g
B. v2/g
C. v/2g
D. v/g - The down stream sloping glacis of the Hydraulic structure is made in such a way to form automatically the _____________ and dissipate the surplus energy of flowing water?
A. Afflux
B. Hydraulic jump
C. Pond level
D. HFL - A water pool is designed on the down stream of the hydraulic structure to dissipate the energy of falling water by providing a water cushion called ______________________?
A. Water pool
B. Cistern
C. Down stream pond
D. Water cushion - Now- a -days the hydraulic structures are designed. Keeping in view the flow net, this was given by __________________?
A. Blight
B. Khosla
C. Lane
D. Darcy - An engineer who is approached by a client for the purpose of design of hydraulic structures like dam. Barrage or Regulator is called ____________________?
A. Chartered Engineer
B. Consulting Engineer
C. Irrigation Engineer
D. All are correct
Advertisement