A. 2.0 – 2.5 – m/sec
B. 2.5 – 3 m/sec
C. 3.0 – 3.5 m/sec
D. 3.5 – 4.0 m/sec
Related Mcqs:
- When a weir is constructed, the downstream .bed of the river goes on eroding and consequently causes progressive lowering of the bed on downstream of weir called__________________?
A. Retrogression
B. Lowering down of bed
C. Ponding on down stream
D. All are correct - The under sluices in a weir are provided, at the level of upstream floor dispose off the sediment deposited on downstream is called______________________?
A. Under sluices
B. Head sluices
C. Scouring sluices
D. Sluice gates - When reservoir is full on upstream side, the maximum stress comes upon__________________?
A. Top of dam
B. Bottom of dam
C. Face of dam
D. All are correct - The water level required on the upstream side of a canal head regulator, so as to feed the off-taking canal with its full supply is called_________________?
A. HFL
B. FSL
C. Pond level
D. Canal level - A water rise takes place on down stream of sloping glacis, when a stream of water moving with high velocity and low depth strikes another stream of flow moving with low velocity and high depth, such breakage in water surface is called______________?
A. Water wave
B. Water tide
C. Hydraulic jump
D. Afflux - A flow of water for a certain discharge when total energy of flow i.e. sum of potential, kinetic and pressure energies is minimum is called_______________________?
A. Shooting flow
B. Critical flow
C. Sub-critical flow
D. Normal flow - Pilot tube is a device, which convert velocity head of flowing water into pressure by ____________________?
A. H = v2/2g
B. H = v/g
C. H = v2 / g2
D. H = v2 / g - The velocity in a large canal or channel measured at a depth of ___________________ gives the mean velocity using the current meter?
A. 0.6m
B. 0.5m
C. 0.6 depth
D. 0.5 depth - The structures, which are constructed on the river bed upstream of head regulator. With this clear water enters in canal such structures are called______________________?
A. Silt excluders
B. Silt ejectors
C. Vortex pipes
D. Silt control structures - The various works constructed on river side to control the flow and pass it safely from hydraulic structures are called ___________________?
A. River controlling works
B. River Training works
C. Marginal Embankment
D. Guide Banks