A. reduced work
B. spoilage
C. rework
D. scrap
Advertisement
Related Mcqs:
- If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be _________?
- A. 42.625 B. 36.724 C. 32.625 D. 41.625...
- If the value added manufacturing time is 65 minutes, the total manufacturing time is 80 minutes, then the manufacturing cycle time will be _________?
- A. 0.8125 B. 0.6125 C. 0.9125 D. 1.725...
- The reduction in setup time, manufacturing cycle efficiency and average time of manufacturing for key products are the examples of ____________?
- A. measures of growth and learning B. measures of internal business processes C. customer measures D. financial measures...
- The direct manufacturing labor costs is added into manufacturing overhead cost to calculate ___________?
- A. transaction costs B. conversion costs C. resale costs D. merchandise costs...
- In throughput costing, the variable manufacturing overhead and direct manufacturing labor cost must be treated as ___________?
- A. accrual cost B. incurred cost C. period costs D. setup costs...
- If the fixed budgeted manufacturing cost is $35000 and the budgeted production units are 7000, then budgeted fixed manufacturing cost per unit will be ___________?
- A. $20 B. $5 C. $10 D. $15...
- If the budgeted annual manufacturing indirect cost is $2250000 and the cost allocation base is 2800 labor hour, then budgeted manufacturing overhead rate will be ___________?
- A. $803.571 per labor hour B. $805 per labor hour C. $905 per labor hour D. $802 per labor hour...
- The package which consists of two or more products to be sold for single price, but components of products in package have separate stand-alone price is called ___________?
- A. step down product B. dual mix product C. bundled product D. reciprocal product...
- An engineering of products or detailed planning of products or services is called ___________?
- A. product design B. research steps C. useful chain D. value added...
- If the direct material cost is $5500 and the prime cost is $25000, then the direct manufacturing labor would be ___________?
- A. $19,500 B. $30,500 C. $45,500 D. $22,500...
Advertisement