A. has meaning
B. has no meaning
C. has index values
D. has no index values
Advertisement
Related Mcqs:
- The cost of particular cost object which cannot be traced in economically plausible way is termed as __________?
- A. indirect cost B. partial cost C. benchmark cost D. direct cost...
- The cost of particular cost object which cannot be traced in economically plausible way is termed as __________?
- A. indirect cost B. partial cost C. benchmark cost D. direct cost...
- If the difference between costs linked to highest and lowest observation of cost driver is $27000 and observation of cost driver is 90 machine hours, then slope coefficient would be ____________?
- A. $800 B. $400 C. $300 D. $600...
- If the difference between costs linked to highest and lowest observation of cost driver is $36000 and observation of cost driver is 30 machine hours, then slope coefficient would be __________?
- A. $1,200 B. $1,400 C. $1,600 D. $1,800...
- If the difference between costs linked to highest and lowest observation of cost driver, is $8000 and observation of cost driver is 40 machine hours, then slope coefficient will be _____________?
- A. $16,000 B. $200 C. $400 D. $20,000...
- In the cause and effect relationship between cost level and cost driver, the inflationary price effects are removed by dividing cost through _______________?
- A. price index B. cost index C. profit index D. cost driver index...
- Considering the relationship of variables, the relationship in which the activity cost is included in the dependent variable, which has similar cost driver is classified as __________?
- A. heterogeneous relationship B. extreme relationship C. no homogeneous relationship D. homogeneous relationship...
- The goodness of fit is used to measure the wellness of ________?
- A. actual values B. predicted values C. residual values D. indexed values...
- The goodness of fit predicted values is also known as ___________?
- A. coefficient of determination B. coefficient of index C. coefficient of residual D. coefficient of prediction...
- The strength of relationship between cost driver and cost is considered as __________?
- A. badness of residual B. goodness of residual C. badness of fit D. goodness of fit...
Advertisement