A. adjusted labor utilization
B. unadjusted labor utilization
C. material utilization
D. capacity utilization
Advertisement
Related Mcqs:
- If the budgeted fixed cost is $55000 and budgeted fixed cost is $55 per unit, then budgeted denominator level is __________?
- A. 2500 units B. 2000 units C. 1000 units D. 1500 units...
- If the budgeted fixed cost is $48000 and per unit budgeted denominator level is 1200 units, then budgeted fixed cost would be __________?
- A. $50 B. $45 C. $55 D. $40...
- If the budgeted fixed cost is $40000 and budgeted fixed cost is $16 per unit, then budgeted denominator level will be __________?
- A. 3500 units B. 2500 units C. 3900 units D. 4900 units...
- The budgeted fixed manufacturing cost is divided by budgeted fixed manufacturing cost per unit to calculate : __________?
- A. fixed material price B. variable materials price C. fixed production units D. budgeted production units...
- If the budgeted fixed cost is $26000, per unit budgeted denominator level is 1300 units, then budgeted fixed cost will be ___________?
- A. $50 B. $30 C. $20 D. $40...
- The fixed budgeted manufacturing cost is $45000 and the budgeted production units are 900, then budgeted fixed manufacturing cost per unit will be ____________?
- A. $200 B. $150 C. $50 D. $100...
- If the fixed budgeted manufacturing cost is $35000 and the budgeted production units are 7000, then budgeted fixed manufacturing cost per unit will be ___________?
- A. $20 B. $5 C. $10 D. $15...
- To calculate budgeted fixed manufacturing cost per unit, the fixed budgeted manufacturing costs are divided to _____________?
- A. budgeted production units B. indirect production units C. input material units D. accrued production units...
- In variable costing, the variable manufacturing and fixed manufacturing cost focus on __________?
- A. distinction B. similarities C. increase in units D. decrease in units...
- If the budgeted annual manufacturing indirect cost is $2250000 and the cost allocation base is 2800 labor hour, then budgeted manufacturing overhead rate will be ___________?
- A. $803.571 per labor hour B. $805 per labor hour C. $905 per labor hour D. $802 per labor hour...
Advertisement