A. manufacturing cost
B. super variable costing
C. throughput costing
D. both B and C
Related Mcqs:
- The costing method, in which the variable manufacturing costs are treated as inventoriable cost is called ___________?
A. manufacturing costing
B. absorption costing
C. variable costing
D. labor costing - The method of inventory costing, in which all variable and fixed manufacturing cost is considered as inventoriable cost can be termed as __________?
A. absorption costing
B. variable costing
C. fixed costing
D. manufacturing cost - The cost which is excluded from inventoriable costs in variable costing method is called _________?
A. variable factory overheads
B. fixed manufacturing cost
C. variable manufacturing costs
D. fixed factory overheads - If the budgeted total direct labor hours are 3800 and budgeted direct labor cost is $480000, then the budgeted direct labor cost rate will be ___________?
A. $126.32 per labor hour
B. $128.32 per labor hour
C. $130 per labor hour
D. $132 per labor hour - If the direct material cost is $5500 and the prime cost is $25000, then the direct manufacturing labor would be ___________?
A. $19,500
B. $30,500
C. $45,500
D. $22,500 - If the budgeted direct labor hours are 4550 and direct labor cost rate is $600 per labor hour then, total direct labor cost would be _____________?
A. $4,730,000
B. $3,730,000
C. $2,730,000
D. $1,730,000 - If the budgeted total direct labor hours are 5500 and budgeted direct labor cost is $755000, then the budgeted direct labor cost rate is _________?
A. $138 per labor hour
B. $137.27 per hour
C. $140 per labor hour
D. $142 per labor hour - If the budgeted direct labor hours are 3550 and direct labor cost rate is $500 per labor hour, then total direct labor cost would be __________?
A. $1,775,000
B. $1,675,000
C. $1,875,000
D. $1,975,000 - The prime cost is $50000 and the direct manufacturing labor is $10000, then the direct material cost will be ____________?
A. $40,000
B. $60,000
C. $52,000
D. $20,000 - If the direct material cost is $85000 and direct manufacturing labor is $25000, then prime cost would be _________?
A. $13,500
B. $55,600
C. $60,000
D. $110,000