A. no cost pool
B. One or two cost pools
C. sustained tracing
D. support tracing
Advertisement
Related Mcqs:
- If an actual indirect cost incurred is $25000 and the indirect cost allocated is $23000, then the over allocated indirect cost would be ________?
- A. $48,000 B. −$2000 C. $2,000 D. −$48000...
- If an actual indirect cost incur is $35000 and the indirect cost allocated is $43000, then the under allocated indirect cost will be __________?
- A. $78,000 B. −$78000 C. −$8000 D. $8,000...
- In the activity based costing method implementation, an output unit level costs are classified as ____________?
- A. indirect costs B. direct cost C. labor cost D. raw material cost...
- In an activity based costing implementation, the product’s diverse demand is based on _________?
- A. batch size B. complexity C. process steps D. all of above...
- An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
- A. variable batch costs B. fixed batch costs C. variable setup costs D. fixed setup costs...
- An implementation of activity based costing would be possible only if the accountants find ____________?
- A. goodness of each activity B. handling of each activity C. cost driver for each activity D. cost object for each activity...
- The costing and allocating situation, in which the indirect cost allocated amount is less than actually incurred amount is known as ___________?
- A. over allocated budget B. under allocated budget C. under allocated indirect cost D. over allocated direct cost...
- If an allocated indirect cost is $1500 and the actual incurred indirect cost is $1200, then this is classified as __________?
- A. applied indirect cost B. applied direct cost C. incurred indirect cost D. over allocated indirect cost...
- In activity based costing system, the description of activity can be classified as __________?
- A. activity list B. activity dictionary C. active purpose D. both A and B...
- In normal costing, the situation in which the allocated amount of indirect cost is greater than the incurred cost, is considered as _____________?
- A. incurred indirect cost B. over allocated indirect cost C. applied indirect cost D. applied direct cost...
Advertisement