A. ∞
B. 1
C. 20.8
D. 2
Related Mcqs:
- Tube side pressure drop in a 1-2 heat exchanger (for turbulent flow of fluids through the tubes) is about __________ times, that in a 1-1 heat exchanger having the same size & number of tubes and operated at the same liquid flow rate ?
A. 2
B. ½
C. 4
D. 8 - In a shell and tube heat exchanger having square pitch, the shell side equivalent diameter is given by (where, P = pitch, d = outside diameter of the tube) ?
A. 4(P2 – πd2/4)/πd
B. (P2 – rd2/4)/rd
C. 4P2/πd
D. πd/4P2 - Overall mass transfer co-efficient in case of absorption of __________ in water is based on the gas film co-efficient only, as the mass transfer process is gas film (phase) controlling ?
A. CO2
B. SO2
C. NH3
D. None of these - The ratio of tube length to shell diameter in case of liquid shell and tube heat exchanger ranges from__________________?
A. 2 to 3
B. 3 to 5
C. 4 to 8
D. 6 to 12 - Ratio of tube length to shell diameter for a shell and tube heat exchanger is________________?
A. 8 : 1 to 12 : 1 for both liquid-liquid and gas-gas heat exchangers
B. 4 : 1 to 8 : 1 for liquid-liquid exchanger
C. < 4 : 1 for gas-gas exchangers
D. Both B. & C. - In a multipass shell and tube heat exchanger, the shell side cross flow area does not depend upon______________________?
A. Baffle spacing
B. Clearance
C. Pitch
D. None of these - In case of a shell and tube heat exchanger, the effect of L/D on inside film heat transfer coefficient (hi) vanishes after a Reynold number of_____________?
A. 1000
B. 3000
C. 5000
D. 10000 - In case of a shell and tube heat exchanger, the minimum shell thickness for carbon steel (inclusive of corrosion allowance) depends on shell diameter and is in the range of ________________ mm?
A. 3-5
B. 5-11
C. 8-15
D. 12-18 - Shell side heat transfer co-efficient in case of square pitch as compared to the triangular pitch under similar condition of fluid flow and tube size is_____________?
A. More
B. Same
C. Less
D. Twice - Tube side heat transfer co-efficient for turbulent flow of liquid through tubes is proportional to___________________?
A. G0.2
B. G0.5
C. G0.8
D. G1.5