A. evaluations to be performed
B. amount of technical work
C. audits and reviews to be performed
D. documents to be produced by the SQA group
Explanation: All other options support a SQA plan
Related Mcqs:
- Which of the following is not an appraisal cost in SQA ?
A. inter-process inspection
B. maintenance
C. quality planning
D. testing - What is a tangible output of an activity that is predicted in a project plan ?
A. Deliverable
B. Activity
C. Condition
D. Process - Reverse engineering is the last activity in a re-engineering project _____________________?
A. True
B. False - What is often undefined and is left to the ingenuity of the project managers and engineers ?
A. Role
B. Exception
C. Activity
D. Process - Which of the following manuals is a user documentation ?
A. SRS -Software Requirement Specification
B. SDD -Software Design Document
C. System Overview
D. None of the mentioned - Which of the following is a software process certification ?
A. JAVA Certified
B. IBM Certified
C. ISO-9000
D. Microsoft Certified - Which of the following manuals is not a user documentation ?
A. Beginner’s Guide
B. Installation guide
C. Reference Guide
D. SRS - Robustness” answers which of the following description ?
A. CASE tools be used to support the process activities
B. Process errors are avoided or trapped before they result in product errors
C. Defined process is acceptable and usable by the engineers responsible for producing the software
D. Process continues in spite of unexpected problems - Which of the following requires design control measures, such as holding and recording design reviews and qualification tests ?
A. CMM
B. ISO 9001
C. ISO 9000-3
D. None of the mentioned - Which of the following is not included in failure costs ?
A. rework
B. repair
C. failure mode analysis
D. none of the mentioned