A. 0.50 m/sec
B. 0.60 m/sec
C. 0.70 m/sec
D. 0.75 m/sec
Related Mcqs:
- The settling velocity of the particles larger than 0.06 mm in a settling tank of depth 2.4 is 0.33 m per sec. The detention period recommended for the tank, is____________________?
A. 30 minutes
B. 1 hour
C. 1 hour and 30 minutes
D. 2 hours - Assertion A.: The minimum self cleansing velocity in the sewer, at least once a day, must be generated. Reason (R): If certain deposition takes place and is not removed, it obstructs free flow and causes further deposition leading to complete blocking of the sewer?
A. Both A and R are true and R is the correct explanation of A
B. Both A and R are true but R is not a correct explanation of A
C. A is true but R is false
D. A is false but R is true - The dimensions of a rectangular settling tank are: length 24 m, width 6 m and depth 3 m. If 2 hour detention period for tanks is recommended, the rate of flow of sewage per hour, is_____________________?
A. 204 cu.m
B. 208 cu.m
C. 212 cu.m
D. 216 cu.m - For sewer mains of 0.5 to 1 m diameter, the ratio of maximum daily sewage flow to the average daily sewage flow is assumed__________________?
A. 1.5
B. 2.0
C. 2.5
D. 3.0 - If the diameter of a sewer is 100 mm, the gradient required for generating self cleansing velocity is__________________?
A. 1 in 60
B. 1 in 100
C. 1 in 120
D. None of these - If the diameter of sewer is 225 mm, the gradient required for generating self cleansing velocity, is___________________?
A. 1 in 60
B. 1 in 100
C. 1 in 120
D. None of these - If the diameter of a sewer is 150 mm, the gradient required for generating self cleansing velocity, is________________?
A. 1 in 60
B. 1 in 100
C. 1 in 120
D. None of these - If a 2% solution of sewage sample is incubated for 5 days at 20°C and the dissolved oxygen depletion was found to be 8 mg/l. The BOD of the sewage is_________________?
A. 100 mg/l
B. 200 mg/l
C. 300 mg/l
D. 400 mg/l - If the depletion of oxygen is found to be 2.5 mg/litre after incubating 2.5 ml of sewage diluted to 250 ml for 5 days at 20°C, B.O.D. of the sewage is_________________?
A. 50 mg/l
B. 100 mg/l
C. 150 mg/l
D. 250 mg/l - The width of a settling tank with 2 hour detention period for treating sewage 378 cu m per hour, is __________________?
A. 5 m
B. 5.5 m
C. 6.5 m
D. 7 m
Advertisement