A. One- sixth of the effective span
B. Breadth of the rib + four times thickness of the slab
C. Breadth of the rib + half clear distance between ribs
D. Least of the above
- RCC Structures Design
- RCC Structures Design
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.