A. Nuclear
B. Hydro
C. Thermal
D. Diesel
Related Mcqs:
- For a diesel generating station the useful life is expected to be around_________Years?
A. 15 to 20 years
B. 20 to 50 years
C. 50 to 75 years
D. 75 to 100 years - Different generating stations use following prime movers?
A. diesel engine
B. hydraulic turbine
C. gas turbine
D. steam turbine
E. any of the above - ____________is the reserved generating capacity available for service under emergency conditions which is not kept in operation but in working order.
A. Hot reserve
B. Cold reserve
C. Spinning reserve
D. Firm power - Generating capacity connected to the bus bars and ready to take load when switched on is known as____________?
A. firm power
B. cold reserve
C. hot reserve
D. spinning reserve - For a power plant which of the following constitutes running cost?
A. Cost of wages
B. Cost of fuel
C. Cost of lubricants
D. All of the above - With reference to a power station which of the following is not a fixed cost?
A. Fuel cost
B. Interest on capital
C. Insurance charges
D. Depreciation - For which of the following power plants highly skilled engineers are required for running the plants?
A. Solar power plants
B. Gas turbine power plants
C. Nuclear power plants
D. Hydro-electric power plants - Load factor of a power station is generally___________?
A. equal to unity
B. less than unity
C. more than unity
D. equal to zero Diversity factor is always - The expected useful life of an hydroelectric power station is around_________________?
A. 15 years
B. 30 years
C. 60 years
D. 100 years - For high value of diversity factor, a power station of given installed capacity will be in a position to supply?
A. less number of consumers
B. more number of consumers
C. neither A. nor B.
D. either A. or B.