A. favorable price variance
B. unfavorable price variance
C. favorable spending variance
D. unfavorable spending variance
Advertisement
Related Mcqs:
- The higher plant leasing, higher administrative costs and higher depreciation on equipment and plants are all the factors of _____________?
- A. favorable spending variance B. unfavorable spending variance C. favorable price variance D. unfavorable price variance...
- The depreciation on plant equipment, salaries of plant managers and plant leasing costs are considered a _____________?
- A. fixed batch cost B. variable batch cost C. variable overhead cost D. fixed overhead cost...
- If the salaries of engineers are $3000, the salaries of supervisors are $4000 and the equipment leasing cost is $3000, then fixed setup costs will be ___________?
- A. $10,000 B. $1,000 C. $7,000 D. $4,000...
- An indirect setup labor costs, costs of setup and equipment maintenance and costs of indirect material can be categorized as ______________?
- A. variable batch costs B. fixed batch costs C. variable setup costs D. fixed setup costs...
- All the salaries are paid to supervisors and engineers and cost of leasing equipment are classified as __________?
- A. variable setup costs B. fixed setup costs C. variable batch costs D. fixed batch costs...
- If the cost of indirect support labor is $5000, equipment maintenance setup cost is $7000 and machinery leasing cost is $4000 then variable fixed cost will be ___________?
- A. $16,000 B. $12,000 C. $18,000 D. $21,000...
- The supplies, plant maintenance, plant rent, plant insurance and cleaning labor come under the type of costs called ____________?
- A. labor costs B. factory overhead costs C. finished costs D. manufacturing costs...
- The sum of cost of direct materials, costs of buildings, equipment, research and development costs is classified as ___________?
- A. throughput costs B. investments C. operating costs D. marginal costs...
- The book value of existing equipment is a historical cost and not necessary for deciding equipment replacement, thus it can be considered as ___________?
- A. operating cost B. sunk cost C. in-house cost D. out-house cost...
- The customer sustaining costs, customer batch-level costs and customer output-unit level costs are classified as _________?
- A. customer level indirect costs B. customer level direct costs C. corporate level direct costs D. corporate level indirect costs...
Advertisement