A. $80,000
B. $12,800
C. $70,000
D. $22,800
Advertisement
Related Mcqs:
- If the difference in costs is $9000 and the difference in machine hours is $15000, then slope coefficient would be ___________?
- A. 1.24 B. 0.24 C. 0.6 D. 1.667...
- If the difference in costs is $7000 and the difference in machine hours of is $18000, then slope coefficient would be ____________?
- A. 2.571 B. 0.39 C. 0.2571 D. 3.39...
- If the difference in costs is $16000 and the slope coefficient is 0.40, then difference in machine hours would be __________?
- A. $50,000 B. $5,400 C. $6,400 D. $40,000...
- The slope coefficient is 0.75 and the difference in machine hours is $65000, then difference in cost would be ___________?
- A. $86,667 B. $48,750 C. $85,000 D. $55,000...
- If the slope coefficient is 0.60 and the difference in machine hours is $50000, then difference in cost can be __________?
- A. $68,700 B. $58,700 C. $30,000 D. $83,333.34...
- If the difference between costs linked to highest and lowest observation of cost driver is $27000 and observation of cost driver is 90 machine hours, then slope coefficient would be ____________?
- A. $800 B. $400 C. $300 D. $600...
- If the difference between costs linked to highest and lowest observation of cost driver is $36000 and observation of cost driver is 30 machine hours, then slope coefficient would be __________?
- A. $1,200 B. $1,400 C. $1,600 D. $1,800...
- If the difference between costs linked to highest and lowest observation of cost driver, is $8000 and observation of cost driver is 40 machine hours, then slope coefficient will be _____________?
- A. $16,000 B. $200 C. $400 D. $20,000...
- For slope coefficient b, the value of the estimated coefficient is considered as ___________?
- A. d-value B. c-value C. t-value D. b-value...
- If the fixed setup cost is $32000 and the variable setup cost is $12000, then the setup cost will be ___________?
- A. $20,000 B. $34,000 C. $44,000 D. $35,000...