A. denominator level choices
B. numerator level choices
C. normal level choices
D. standard level choices
Related Mcqs:
- If the capacity utilization and its cost are fixed in product costing, the capacity management is ___________?
A. for short run
B. for long run
C. for one day
D. for few days - The costing system, which is a combination of process costing and job costing system, is classified as __________?
A. weighted costing system
B. average costing system
C. hybrid costing system
D. double costing system - The performance is evaluated only on the basis of price variance, if the performance evaluation is __________?
A. positive
B. negative
C. zero
D. one - The normal costing and standard costing methods are used in decisions such as ___________?
A. investment decisions
B. pricing decisions
C. product mix decisions
D. Both B and C - The capacity level of operations which is less than theoretical capacity is considered as ___________?
A. practical capacity
B. theoretical costing
C. standard capacity
D. actual capacity - If the fixed manufacturing cost expenses are under variable costing and are not expensed in absorption costing, it is resulting in _________?
A. production exceeds breakeven sales
B. breakeven sales exceeds production
C. price exceeds cost
D. cost exceeds price - The variance which is included in absorption costing, but not in variable costing is classified as __________?
A. production volume variance
B. cost volume variance
C. profit volume variance
D. fixed cost variance - The costing technique, which classify all the activities in costing hierarchy is classified as ____________?
A. activity based costing
B. non-financial costing
C. profit costing
D. lump sum costing - The measuring of capacity levels, in terms of practical and theoretical capacity is classified as _________?
A. capacity write down
B. capacity write up
C. capacity supplied
D. capacity borrowed - The difference between master budget capacity and practical capacity is considered as ________?
A. normal used capacity
B. unplanned and unused capacity
C. planned unused capacity
D. unplanned used capacity