A. relevant costing diagram
B. cause and effect diagram
C. control chart
D. Pareto diagram
Related Mcqs:
- The revenues are subtracted from the cost of direct materials of sold goods is to calculate _________?
A. throughput contribution
B. operating cost contribution
C. operating contribution
D. marginal contribution - If the manufacturing cycle efficiency is 0.725 and the total manufacturing time is 45 minute, then the value added manufacturing time will be _________?
A. 42.625
B. 36.724
C. 32.625
D. 41.625 - If the value added manufacturing time is 65 minutes, the total manufacturing time is 80 minutes, then the manufacturing cycle time will be _________?
A. 0.8125
B. 0.6125
C. 0.9125
D. 1.725 - If the number of processes, in which employees who can make decisions are 20 and the number of processes are 50, then employee empowerment ratio will be _________?
A. 0.9
B. 0.4
C. 0.3
D. 0.8 - The cost, which is related to specific cost object and economically traceable, will be classified as _________?
A. direct cost
B. indirect cost
C. line cost
D. staff cost - The larger number of manager subordinates and the higher level manager are termed as _________?
A. activity subordinates
B. broader responsibility center
C. broader subordinates
D. activity ordinates - If the production is greater than sales, then operating income under absorption costing is _________?
A. higher income
B. zero dividends
C. negative income value
D. lower income - The relationship between cost and cost drivers is _________?
A. stationary
B. not stationary
C. intrinsic
D. extrinsic - A cost, consists of some fixed and some variable cost with respect to machine setup hours is termed as _________?
A. setup cost
B. batch cost
C. facility cost
D. lump sum cost - The second step in developing operating budget is to _________?
A. identify variable overhead cost
B. compute the per unit rate
C. choose the budgeting period
D. select allocation bases