A. systems designer
B. project manager
C. systems owner
D. external system user
Related Mcqs:
- Project Management ensures that______________?
A. project’s risk is assessed
B. project’s feasibility is assessed
C. system is developed at minimum cost
D. both A and B - _____________ type of testing ensures the system is free of errors and is ready to be placed into operation?
A. Audit
B. General
C. Technical
D. Data - _________ systems are interactive information systems that assist a decision maker in approaching ill-structured problems by offering analytical models and access to database ?
A. Decision making
B. Systematic
C. Cognitive
D. Decision support systems - What should not be part of an acceptable use policy ?
A. Allowable use of systems
B. Legal obligations
C. Encryption policies
D. User responsibilities - Michael hammer defines re-engineer as ___________ and radical redesign of business process to achieve the performance such as cost, quality, service and speed?
A. Business process
B. The fundamental rethinking
C. Organization restructuring
D. None of the above - The first CMM level at which measurable goals for quality and productivity are established is______________?
A. Level 1
B. Level 2
C. Level 3
D. Level 4 - A property or quality the system must have is called a_______________?
A. scope
B. functional requirement
C. preliminary requirement
D. nonfunctional requirement - The most important attribute of information quality that a manager requires is ?
A. relevance
B. media
C. presentation
D. timeliness - An ongoing activity of systems support is________________?
A. assisting users
B. adapting the system to new requirements
C. recovering the system
D. all of the above - The task of identifying and expressing system requirements is performed in which phase of systems analysis ?
A. problem analysis phase
B. logical design phase
C. scope definition phase
D. requirements analysis phase