A. Translation
B. Correction
C. Adaptation
D. Prevention
Software Engineering Mcqs
Software Engineering Mcqs for Preparation of Job Test and interview, freshers, Students, competitive exams etc. Multiple choice questions here are on topics such as Basics of software engineering, types, advanced, design, testing, evolution, testing, secutity etc.
| SOFTWARE ENGINEERING MCQS | |||
|---|---|---|---|
| 1. | Basics of Software Engineering | 2. | Software Engineering types |
| 3. | Requirement Engineering | 4. | Advanced Software Engineering |
| 5. | Architectural Design | 6. | Design and Implementation |
| 7. | Software Design | 8. | Software Modelling |
| 9. | Software Management | 10. | Software Evolution |
| 11. | Software Metrics | 12. | Dependability and Security |
| 13. | Software Processes | 14. | Software Reliability |
| 15. | Software Testing | 16. | |
A. Uses incremental product delivery strategy
B. Only essential work products are produced
C. Eliminate the use of project planning and testing
D. All of the mentioned
A. Outputs are decided through a process of negotiation during the software development process
B. Specification, design, implementation and testing are interleaved
C. Iteration occurs within activities
D. All of the mentioned
A. Incremental Development
B. Iterative Development
C. Linear Development
D. Both Incremental and Iterative Development
A. Spiral Model
B. Waterfall Model
C. Rad Model
D. 4GT Model
A. Individuals and interactions
B. Working software
C. Customer collaboration
D. All of the mentioned
A. Improved productivity of software engineers
B. Reduction in software development time
C. 4GT helped by CASE tools and code generators offers a credible solution to many software problems
D. None of the mentioned
A. on Lisp machine
B. on report generators
C. from database query languages
D. from GUI creators
A. WINWIN Spiral Model
B. Spiral Model
C. Concurrent Model
D. Incremental Model
A. Doesn’t work well for smaller projects
B. High amount of risk analysis
C. Strong approval and documentation control
D. Additional Functionality can be added at a later date
