A. 3.0%
B. 3.4%
C. 3.7%
D. 4.0%
Engineering Economy
Engineering Economy
A. P 4,880.00
B. P 4,820.00
C. P 4,860.00
D. P 4,840.00
A. P 6,999.39
B. P 6,292.93
C. P 6,222.39
D. P 6,922.93
A. P 142,999.08
B. P 143,104.89
C. P 142,189.67
D. P 143,999.08
A. P 43,600.10
B. P 43,489.47
C. P 43,263.91
D. P 43,763.20
A. P 7,654.04
B. P 7,731.29
C. P 7,420.89
D. P 7,590.12
A. P 2,500.57
B. P 2,544.45
C. P 2,540.56
D. P 2,504.57
A. P 1,290.34
B. P 1,185.54
C. P 1,107.34
D. P 1,205.74
A. P 727.17
B. P 717.17
C. P 714.71
D. P 731.17
1. The construction of the building now to cost P 400,000
2. The construction of a smaller building now to cost P300,000 and at the end of 5 years, an extension to be added to cost P 200,000.
By how much is proposal B more economical than proposal A if interest rate is 20% and depreciation to be neglected ?
A. P 19,122.15
B. P 19,423.69
C. P 19,518.03
D. P 19,624.49