A. Define
B. Control
C. Measure
D. Analyse
Explanation: It is an additional step added for existing processes and can be done in parallel.
Related Mcqs:
- What is Six Sigma ?
A. It is the most widely used strategy for statistical quality assurance
B. The “Six Sigma” refers to six standard deviations
C. It is the most widely used strategy for statistical quality assurance AND The “Six Sigma” refers to six standard deviations
D. A Formal Technical Review(FTR) guideline for quality walkthrough or inspection - Which of the following is non-functional testing ?
A. Black box testing
B. Performance testing
C. Unit testing
D. None of the mentioned - Which of the following is not used in measuring the size of the software_____________________?
A. KLOC
B. Function Points
C. Size of module
D. None of the mentioned - Which of the following is not a software testing generic characteristics ?
A. Different testing techniques are appropriate at different points in time
B. Testing is conducted by the developer of the software or an independent test group
C. Testing and debugging are different activities, but debugging must be accommodated in any testing strategy
D. None of the mentioned - Which of the following is one of the steps in the integration testing of OO software ?
A. cluster testing
B. thread-based testing
C. use-based testing
D. none of the mentioned - Which of the following testing types is not a part of system testing ?
A. Recovery testing
B. Stress testing
C. System testing
D. Random testing - Which of the following is a part of testing OO code ?
A. Validation tests
B. Integration tests
C. Class tests
D. System tests - Which of the following is not a conflict in software development team ?
A. Simultaneous updates
B. Shared and common code
C. Versions
D. Graphics issues - Which of the following is not included in Issues Meetings ?
A. Issues gathered the day before
B. Regular schedule of meeting
C. Discussion with business
D. Attendance - Which of the following is not a change management process ?
A. Log the changes
B. Estimate impact on effort and schedule
C. Review impact with stakeholders
D. None of the mentioned