A. Software availability
B. Software reliability
C. Software failure
D. None of the mentioned
Explanation: Given a set of valid requirements, all software failures can be traced to design or implementation problems.
Related Mcqs:
- Software mistakes during coding are known as__________________?
A. errors
B. failures
C. bugs
D. defects - Software Testing with real data in real environment is known as_____________________?
A. alpha testing
B. beta testing
C. regression testing
D. none of the mentioned - Quality Management in software engineering is also known as_____________________?
A. SQA
B. SQM
C. SQI
D. SQA and SQM - By collecting __________________ during software testing, it is possible to develop meaningful guidelines to halt the testing process?
A. Failure intensity
B. Testing time
C. Metrics
D. All of the mentioned - Which of the following is not a software testing generic characteristics ?
A. Different testing techniques are appropriate at different points in time
B. Testing is conducted by the developer of the software or an independent test group
C. Testing and debugging are different activities, but debugging must be accommodated in any testing strategy
D. None of the mentioned - The construction of object-oriented software begins with the creation of__________________?
A. design model
B. analysis model
C. code levels
D. both design and analysis model - Which of the following is one of the steps in the integration testing of OO software ?
A. cluster testing
B. thread-based testing
C. use-based testing
D. none of the mentioned - Which of the following is not a conflict in software development team ?
A. Simultaneous updates
B. Shared and common code
C. Versions
D. Graphics issues - What is one or more software configuration items that have been formally reviewed and agreed upon and serve as a basis for further development ?
A. Configuration
B. Baseline
C. Software
D. All of the mentioned - What is a collection of software elements treated as a unit for the purposes of SCM ?
A. Software Configuration Item
B. Baseline
C. Configuration
D. Configuration Control Board