A. Degree of Rigor
B. Adaptation criteria
C. Task Set
D. Both degree of Rigor and adaptation criteria
Related Mcqs:
- Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM - What is the recommended distribution of effort for a project ?
A. 40-20-40
B. 50-20-30
C. 30-40-30
D. 50-30-20 - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned - A number of independent investigators have developed a team-oriented approach to requirements gathering that can be applied to establish the scope of a project called ?
A. JAD
B. CLASS
C. FAST
D. None of the mentioned - The project planner examines the statement of scope and extracts all important software functions which is known as___________________?
A. Association
B. Decomposition
C. Planning process
D. All of the mentioned - Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned - The environment that supports the software project is called_______________________?
A. CLSS
B. SEE
C. FAST
D. CBSE - If a Direct approach to software project sizing is taken, size can be measured in__________________?
A. LOC
B. FP
C. LOC and FP
D. None of the mentioned - Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned