A. The difficulty of the problem to be solved
B. High frustration caused by personal, business, or technological factors that causes friction among team members
C. The degree of sociability required for the project
D. The rigidity of the delivery date
c
Explanation: Development is irrelevant of social quotient.
Related Mcqs:
- Which of the following is an activity that distributes estimated effort across the planned project duration by allocating the effort to specific software engineering tasks ?
A. Software Macroscopic schedule
B. Software Project scheduling
C. Software Detailed schedule
D. None of the mentioned - Which model was used during the early stages of software engineering, when prototyping of user interfaces, consideration of software and system interaction, assessment of performance, and evaluation of technology maturity were paramount ?
A. Early design stage model
B. Post-architecture-stage model
C. Application composition model
D. All of the mentioned - What is a collection of software engineering work tasks, milestones, and deliverables that must be accomplished to complete a particular project ?
A. Task set
B. Degree of milestone
C. Adaptation criteria
D. All of the mentioned - Which type of software engineering team has a defined leader who coordinates specific tasks and secondary leaders that have responsibility for sub tasks ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled centralized (CC)
D. None of the mentioned - Which software engineering team has no permanent leader ?
A. Controlled decentralized (CD)
B. Democratic decentralized (DD)
C. Controlled Centralized (CC)
D. None of the mentioned - Which of the following is/are main parameters that you should use when computing the costs of a software development project ?
A. travel and training costs
B. hardware and software costs
C. effort costs (the costs of paying software engineers and managers)
D. all of the mentioned - Which of the following are parameters involved in computing the total cost of a software development project ?
A. Hardware and software costs
B. Effort costs
C. Travel and training costs
D. All of the mentioned - Which of the following is not an effective software project management focus ?
A. people
B. product
C. popularity
D. process - Which of the following is a project scheduling method that can be applied to software development ?
A. PERT
B. CPM
C. CMM
D. Both PERT and CPM - A software ______________ provides the framework from which a comprehensive plan for software development can be established?
A. people
B. product
C. process
D. none of the mentioned