A. Investigation
B. Design
C. Construction and Test
D. All of the mentioned
Explanation: All the options are the activities of requirement management.
- Requirement Engineering
- Requirement Engineering
IF YOU THINK THAT ABOVE POSTED MCQ IS WRONG.
PLEASE COMMENT BELOW WITH CORRECT ANSWER AND ITS DETAIL EXPLANATION.