A. method study and work measurement
B. method study and time study
C. time study and work measurement
D. method study and job evaluation
E. value analysis and work measurement
Related Mcqs:
- Basic tool in work study is __________________?
A. graph paper
B. process chart
C. planning chart
D. stop watch
E. analytical mind - What does symbol āDā imply in work study ___________________?
A. inspection
B. transport
C. delay/temporary storage
D. permanent storage
E. none of the above - Work study is most useful_______________?
A. where production activities are involved
B. in judging the rating of machines
C. in improving industrial relations
D. in judging the output of a man and improving it
E. where men are biggest contributor to success of a project - Work study is done with the help of_______________?
A. process chart
B. material handling
C. stop watch
D. all of the above
E. none of the above - Work study is concerned with_________________?
A. improving present method and finding standard time
B. motivation of workers
C. improving production capability
D. improving production planning and control
E. all of the above - Micromotion study involves following number of fundamental hand motions_______________?
A. 8
B. 12
C. 16
D. 20
E. 24 - Which of the following engines can work on very lean mixture__________________?
A. S.I. engine
B. C.I. engine
C. two stroke engine
D. four stroke engine
E. all of the above - Which one of the following metals would work-harden more quickly than the others__________________?
A. copper
B. brass
C. lead
D. silver
E. aluminium - The main advantage of line organisation is its_______________?
A. effective command and control
B. defined responsibilities at all levels
C. rigid discipline in the organisation
D. ability of quick decision at all levels
E. all of the above - The main disadvantage of line organisation is_________________?
A. top level executives have to do excessive work
B. structure is rigid
C. communication delays occur
D. all of the above
E. none of the above