A. the maximum time which an activity might require
B. the average time required for a job
C. the most probable time considering all conditions
D. the minimum time in which an activity can possibly be accomplished
E. the earliest finish
Related Mcqs:
- PERT is___________________?
A. an analytic tool in concept
B. limit up of event oriented diagrams
C. used for research and development projects
D. based on three time estimates for activities linking up two events
E. all of the above - Expediting function consists in keeping a watch on__________________?
A. operator’s activity
B. flow of material and in case of trouble locate source of trouble
C. minimising the delays
D. making efficient despatching
E. none of the above - Templates are used for_________________?
A. a planning layout
B. flow of material
C. advancing a programme in automatic machines
D. copying complicated profiles
E. none of the above - Father of time study was_________________?
A. F.W. Taylor
B. H.L. Gantt
C. F.B. Gilberfh
D. R.M. Barnes
E. H.B. Maynord - ‘Value’ for value engineering and analysis purposes is defined as_____________________?
A. purchase value
B. saleable value
C. depreciated value
D. present worth
E. function/cost - Gnatt charts provide information about_____________?
A. break even point analysis
B. production schedule
C. material handling layout
D. determining selling price
E. value analysis - Process layout is employed for_________________?
A. batch production
B. continuous type of product
C. effective utilisation of machines
D. all of the above
E. none of the above - String diagram is used_________________?
A. for checking the relative values of various layouts
B. when a group of workers are working at a place
C. where processes require the operator to be moved from one place to another
D. all of the above
E. none of the above - Activity s,lack or float of any event on a PERT/CPM chart is represented by__________________?
A. latest start time of succeeding event -earliest finish time of preceding event activity time
B. latest start time of the event – earliest start time of the event
C. latest finish time of event – earliest finish time of the event
D. anyone of the above
E. none of the above - CPM is the___________________?
A. time oriented technique
B. event oriented technique
C. activity oriented technique
D. target oriented technique
E. work oriented technique